Assignment 2 Grading Criteria


Provided an executive summary of the project including all parts of the report.

Explained the potential success of the project including advantages in the areas of saving money, saving time, and potential future IT projects.

Included details about the types of individual computers that will be installed (brand, RAM, CPU, etc.).

Included information and details about other types of hardware that will be required for the installation (routers, printers, etc.).

Included information about the server to be used and how it will connect internally to the network.

Added information about how the network will connect to the Internet (firewall, monitoring service, connection type, etc.).

Provided the timeline for the project to be successful that integrates all portions of the work breakdown structure.

Used correct spelling, grammar, and professional vocabulary.