VoIP Part 1 Work Breakdown Structure, management homework help

Students, please view the “Submit a Clickable Rubric Assignment” in the Student Center.
Instructors, training on how to grade is within the Instructor Center.

Assignment 3: VoIP Part 1 (Work Breakdown Structure)
Due Week 5 and worth 80 points

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview
As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1.   Write a one to two (1-2) page summary document in which you:

a.  Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b.  Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2.  Use Microsoft Project to create a WBS which:

a.  Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b.  Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c.  Contains Work Breakdown Structure Code for each task.

d.  Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

  • Identify how project management improves the success of information technology projects.
  • Explain the relationship of the scope of a project to the work breakdown structure.
  • Use technology and information resources to research issues in IT project management.
  • Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Click here to view the grading rubric for this assignment.

 
Looking for a Similar Assignment? Order now and Get 10% Discount! Use Coupon Code "Newclient"

If this is not the paper you were searching for, you can order your 100% plagiarism free, professional written paper now!

Order Now Just Browsing

All of our assignments are originally produced, unique, and free of plagiarism.

Free Revisions Plagiarism Free 24x7 Support